Ro-Ro Terminal Gogha

Project Value: £50 million

Service: Marine civil and structural design

Team 

Client: Gujarat Maritime Board

Contractor: Essar Group

Description

The scheme consisted of theconstruction of a 500 metre long bund, a 450 metre long jetty, a 100 metre longlinks pan bridge (weighing 950 tonnes)and a 50 x 30 metres pontoon. We areproud to have been the designers of the world’s longest linkspan bridge.

Project Design:

 Kashec provided full marinecivil and structural design services for this scheme. The structure consistedof a 100 metre long linkspan supported on 50 x 30 metres pontoon of structuralsteel construction. The 450 metre long reinforced concrete jetty was supportedon piles.